Oil & Gas


Pre-FEED Study for Gas Processing Facility GPF

Carry out the Pre-FEED study for a new Gas Processing Facility along with gas export pipeline.

The package items involved in the Pre-FEED study are Inlet Separators, Compressor Package, TEG Unit Package, Gas Metering with analyzers, Pig Launcher / Pig Receiver, Utility Packages- Fuel Gas, Instrument Air, Chemical Injection System, Power Generation, Potable Water, Other Systems- Control System, Open / Closed drain System, Overpressure protection system.

Client- Enerflex, UAE

Year- 2018

Pre-Bid Engineering Services related to Civil Structural works

Prepare the required civil /structural drawings to provide clarity for the civil contractor on the scope and also to prepared MTO. 

Client- Control and Application Emirates, UAE

Year- 2018

Pre-Bid Engineering Services for New Gas Sweetening Facility at BS-171 West Kuwait

Pre-Bid Engineering support for New Gas Sweetening Facility and Sulphur Recovery Unit at West Kuwait in Process, Instrumentation, Piping, Electrical, Mechanical, Civil & Structural and HSE

Client – KOC- SPETCO, Kuwait

Year – 2018

Chilled Water Piping Network

Preparation of shop drawings of Piping, Piping GAD, Stress Analysis (Caesar II) and Hydraulic Study (Pipenet)

Client – Al-Yousifi Engineering & Constructution Co. W.L.L

Year – 2018

Process Design Review ELOMP Phase-IV

Review & validation of process calculation, data sheet, P&ID, PFD, UFD etc

Client- Cylingas, Fujairah, UAE

Year- 2017

Gas Plan Facility – E&I

Scope of Electrical & Instrumentation like lighting layout, cable block diagram, cable schedule, lighting datasheet, F&G datasheet, PAGA speaker system etc. Scope also included PDMS modelling of the E&I part.

Client- Confidential

Year- 2017

WK GSF Expansion Works – New Train

Detailed Engineering to further enhance the capacity of the Gas Sweetening Facility by adding a new Gas Treating Train of 40 MMSCFD.

Client- KOC- SPETCO, Kuwait

Year- 2017

WARA Pressure Maintenance Project

3D Modelling, subsequent design and engineering in Piping, Civil, Electrical, Instrumentation and HSE for EWDP and Manifolds/ well heads.

Client- China Petroleum Engineering and Construction Corporation

Year- 2017

Tube Leak Pressure Protection on Chiller Exchanger DGP Train 1

Engineering evaluation of installing a tube leak pressure protection on the exchanger and connection to Flare, Flare study, sizing of PSV and to address tube rupture scenario during shutdown.

Client- Confidential, Oman

Year- 2017

Pre-Bid Engineering for existing Pilot Gas Lifting System Expansion

FEED verification and endorsement, preparation of datasheets/ specifications for procurement of items/ equipment/ packages, MTO’s, TBE (Technical Bid Evaluations) and clarifications with vendors in Process, Instrumentation, Electrical, Piping, Pipeline, Mechanical, Civil & Structural and HSE

Client – Ratba’a Contracting Co. LLC, Iraq

Year – 2017

Engineering services of NG Filter package

Performing Residual Engineering including stress analysis, pipe support and its foundation,  filter foundation, Electrical & Instrumentation trench sections modifications, Lighting Facility at NG filter location etc

Client- Peninsular Petrotech, Qatar

Year- 2017

Pre-Bid Engineering – H2S Removal

Pre-Bid support for a new gas plant including cost estimation

Client- Confidential

Year- 2017

Engineering support for Bulk Desander

Performing stress analysis, structural analysis, preparation of skid structural GA drawings, lifting study etc.

Client- Confidential, Oman

Year- 2017

Pre- Bid Engineering Support for Integrated Gas Surface Facilities of Cairn India Vedanta

Pre – Bid Engineering support including FEED Verification, BOQ’s and MTO’s, MR, Technical Clarifications and evaluation of Bids from Vendor

Client- AFCONS Infrastructure Ltd, India

Year- 2017

ONGC Gas Compressor Installations -Ahmedabad, Gujarat

3D Modelling for a Compressor unit along with Civil and Piping design.

Client- ONGC- TATA Projects, Wadu, Ahmedabad, Gujarat

Year- 2016

Detailed Design For Providing Booster Compressor And Integration To The Existing System Of Central Process Plant At PTTEP Shams.

Detail engineering for providing booster compressor and associated system into existing system including process, piping, instrumentation, civil and structural scope.

Client- Confidential, Oman

Year- 2016

Engineering Documentation of Operating Management System (OMS) and Operation and Maintenance Manual (O&M) for Gas Treatment and Compression Facility at Oman

Preparation of Operating Management System (OMS) and Operation and Maintenance Manual (O&M)

Client- Enerflex/ Oxy, Oman

Year- 2016

Gas Dispersion study for Daleel Gas Plant Facility

Flare dispersion study, Gas generators and Boilers  exhaust flue gas study.

Client- Confidential, Oman

Year- 2016

Basic And Detailed Engineering Of QAPCO WWTP Power Distribution & Control System

The additional work of EPCC of WWTP Power Distribution & Control System Project has to be integrated and aligned with WWTP Revamp Project in terms of schedule, in such a way so as to cause no interference to existing operations

Client- QAPCO- Peninsular

Year- 2016

Design and Engineering for Jurassic Production Facility at West Raudhatain, North Kuwait.

JPF Project has a capacity of processing 40 STMBOPD Oil and 104 MMSCFD Gas & 200 TPD of molten Sulphur.

Scope includes Detailed Engineering for the following units-

Oil Separation Plant, Dehydration & Desalting, Crude Stabilization, Metring & Export System, Gas Compression, Vapor Recovery Units, Gas Sweetening and Dehydration, Gas Metering & Export, Plant Refrigeration / Chilled Water System, Sulphur Recovery Unit, Raw Water Treating Plant, ETP, Effluent Water Disposal Systems, Chemical Injection Systems, Steam Systems, Electrical Power Generation Plant, Plant Control & Safety Systems, Data Communication System, Control Room, MCC Building, Workshops, Other Supporting Utilities.

PETROCIL performed Detailed Engineering Services for the above systems including Process, Mechanical, Rotating Equipment, Piping, Electrical, Instrumentation, Civil-Structural and HSE disciplines. The main activities included –Preparation of drawings, Preparation of data sheets and specifications, Preparation of project philosophies, Preparation of material requisitions and other documents, Vendor Document Review and Technical Bid Evaluation, Ensure that all drawings, data, specifications and other information submitted by Vendor are meeting the project requirements, Ensure that all detailed engineering services comply with safety standards, Participate in Hazop, SIL, QRA and other studies, Preparation of Commissioning and Operation Manuals etc.

Client- KOC- SPETCO

Year- 2016

Engineering Services for HOLTTF-2, North Kuwait

Engineering Service for UN Heavy Oil Long Term Well Testing Facility is built for one train producing 15 STMBOPD Crude Oil and handling associated sour gas of 10 MMSCFD with maximum inlet concentration  5% (mole) H2s and 3% (mol) CO2.

Client- KOC-GOFSCO, Kuwait

Year- 2016

Production facility at Kuwait

Firefighting system design (Basic and Detailed Engineering)

Client- Confidential

Year- 2016

Engineering Services Support

Providing drafting service for various projects.

Client- Sini Siirtech Nigi, Italy

Year- 2016

SIBA Field Development Project- Flow Assurance Study

To perform flow assurance steady state and transient analysis for the production gathering system and steady state hydraulic analysis for methanol distribution system in SIBA Field development.

Client- Mott Macdonalds, India

Year- 2015

Upgrading GSF to treat 50 MMSCFD gas

Detailed Engineering Upgradation/ Enhancement work for upgrading GSF to treat 50 MMSCFD gas.

Client- KOC- SPETCO

Year- 2015

Heavy Oil Production – Temporary Facility for Kuwait Oil Company

Engineering Service for Heavy Oil Facility.

Client- KOC- SPETCO

Year- 2015

Engineering services for the Condensate Storage and Loading System

Scope envisages the detailed engineering services and procurement support for the condensate storage and handling system for the 100 MMSCFD gas treatment and compression facility.

Client- OXY & Enerflex

Year- 2015

Design and Engineering services for Chemical Injection Skids

Design and engineering services for 3 chemical injection skids involving Process, Piping, Mechanical, Electrical, Instrumentation and Structural scope.

Client- OXY & B-WI, Oman

Year- 2015

Corrosion Risk assessment & Overpressure protection

Conducting study for the corrosion risk assessment and over pressure protection for facilities in the gas expansion project.

Client- OXY OMAN- Enerflex, Oman

Year- 2015

Enhancement of existing EPF 50 at North Kuwait

Basic engineering package services for the production enhancement included the preparation of P&ID, PFD, Simulation, Process Data sheets, Functional specifications for various packages such as Gas Sweetening Packages, Gas Dehydration package, Acid Gas incineration Package and Refrigeration Package.

Client- KOC

Year- 2014

40 MBOPD Long Term Testing Facilities(LTTF) for KOC

Process Engineering for the Basic Engineering package for LTTF including Simulations, preparation of PFD, P&ID. Process Data Sheets for all equipment, Functional Specifications for various Packages such as Gas Sweetening Packages, Gas Incineration and Refrigeration, Hydraulic Studies, Plot Plan etc.

Client- KOC-Gulfspic

Year- 2014

De-Bottlenecking study of Gas Sweetening Facility.

To carry out process simulation for the inlet section as well as gas dehydration/ report with the specific design conditions and feed compositions. To obtain the simulation for amine plant from APL. To evaluate the critical equipment for adequacy based on new simulation report. To identify any bottlenecks. Evaluate various options for debottlenecking and suggest suitable modification to achieve new capacity of 50 MMSCFD. To provide technically sound and viable recommendations that are needed to reinforce the plant for operating continuously at the new capacity of 50 MMSCFD.  To provide budgetary proposal for revamping the GSF to be capable of handling up to 50 MMSCFD gas instead of the contractually required 40MMSCFD gas.

Client- KOC-SPETCO

Year- 2014

GASCO upgrading of substation-19 at MAQTA FEED

Power System Study by using ETAP Software

  1. Upgrade system model of the electrical equipment for substation -19 and control room
  2. Load Flow Study
  3. Short Circuit Study
  4. Voltage drop during normal and during largest motor starting
  5. Motor start study (For 288 KW-FW-FW Supply pumps – Existing 2 Nos.)

Client- GASCO-  Litwin PEL, UAE

Year- 2014

EPC Work for Reconnecting & upgrade CRS for Al Mirfa Power Company in Al Ain for Dolphin Energy

Detailed Engineering for piping, electrical & instrumentation specifications, foundation design and drawings, structural design and drawings, grading layout, slab calculations etc.

Client- Dolphin Energy- ALSA, UAE

Year- 2014

Engineering for EPC works for Fire Training Ground at MPS-Habshan

Complete design and engineering of the fire training ground located at Habshan. The disciplines involved were Process, Piping, Mechanical, Civil, Structural, Instrumentation and Electrical. The facility consisted of Simulator Tank, Fuel Tank and Pumps, Shelters, Fire Reel Hoses, Monitors, Hydrants etc. Activities included in Petrocil scope were P&ID’s, Safety Layouts, Data Sheets, Design Calculation of equipment, Piping detail drawing generation, Structural Pipe Support Design & Drawings, Equipment foundation design, Pipe Support Foundation design, Structural Design for various sheds and shelters, Electrical Data Sheets & Specifications, Lighting & Earthing Design and Layouts, Single Line Diagrams, Instrument Data Sheets, Instrument Cable routing & Layout, Modification of CCTV & PAGA system, Discipline MTO’s, etc.

Client- ADCO-IPIC- ALSA, UAE

Year- 2014

Engineering Services Support

Survey and As- built Services for the entire EPPCO Terminal Facilities located in Fujairah.

Client- ENOC/EPPCO- Nico International, Fujairah

Year- 2014

Engineering for skid mounted desalter packages (2 trains/ 2 stage)

Design and fabrication drawings for desalter, 3 D modeling and piping design/ drawings, skid structural design, lifting analysis, fabrication drawings for 2 stage desalter (2 trains)

Client- SEPL

Year- 2014

Ex Survey on ABAN VII Jack up Rig Vessel

Engineering Services for EX Surveys of the various items of equipments installed in Aban VII Jack up Rig Vessel

Client- ABAN Offshore

Year- 2013

EPC for additional manifolds at RDS 1&5 in ADOC

Detailed engineering including pipe support structural design, pipe support structural design drawings, pipe support foundation design, pipe support foundation design drawings, access platforms design and detail drawings.

Client- ADCO-ALSA, Abu Dhabi

Year- 2013

Fabrication of Manifolds- ASAB Fields in ADCO

Detailed engineering including pipe support structural design, pipe support structural design drawings, pipe support foundation design, pipe support foundation design drawings, access platforms design and detail drawings.

Client- ADCO-ALSA, Abu Dhabi

Year- 2013

Instrument Modification in ASR gas Facilities – ADCO

Datasheets for instruments, cable schedule, cable layouts, loop diagrams, inter connection diagrams, I/O Lists, Cause and Effect Diagram, Instrument MTO, P&ID modifications etc.

Client- ADCO- ALSA, UAE

Year- 2013

Artificial Recharge and Utilization of Ground Water Resources in Liwa Area

Technical Document review of all process/hydraulics related documents and corresponding co-ordination of Technical Document Review

Client- TRANSCO, Abu Dhabi

Year- 2013

Flow rate study for export pumps at GPS Chemoil

Preparation of a flow rate study report for the export pumps at the GPS Chemoil terminal. The study included findings, conclusions and recommendations for the low flow rate of the export pumps.

Client- NICO International, Fujairah, UAE

Year- 2013

Validation of Gas Re-injection Project (GRIP) capacity change (From 30 to 60 MMSCFD)

3rd party validation for Cost/size variation of Gas Re-injection Project (GRIP) capacity change (From 30 to 60 MMSCFD). Job involves identifying the equipment/ piping / instruments affected by capacity change and validate cost implication o enable KOC to approve cost variation.

Client- KOC-SPETCO

Year- 2013

Engineering Services Support for EF5 Project

Generation of Piping Detailed drawings for all Piping network for the EF5 Project

Client- Qatar Steel Company

Year- 2013

Engineering Services for Decommissiong & Demolition of EFX BP Facility Oman

Engineering Documentation and Deliverables such as procedures, plans, drawings, BOQs for Degassing and Demolition of the entire facility.

Client- BP Oman & Enerflex

Year- 2013

Consultancy Services for Benzene Study for FSPO

Review of existing facilities of FSPO and recommendation of the most suitable method for minimizing benzene emissions.

Client- MISC Berhand

Year- 2013

Engineering Services for EPF

As-built Services for the Early Production facilities

Client- OOCEP & Enerflex, Oman

Year- 2012

Hazop Services for Early Production Facility

Participation in HAZOP Sessions

Client- OOCEP & Enerflex, Oman

Year- 2012

Front End Engineering and Design for Revamp of Existing 50 MBOPD Early Production Facility Upgrade/ Revamp

Front End Engineering and Design for Revamp of 50 MBOPD Early Production Facility. The project envisages enhancing of production capacity of the pant from 135 MMSCFD  & 50 MBOPD to 175 MMSCFD & 70 MBOPD and then to 210 MMSCFD/ 84 MBOPD.

Client- KOC

Year- 2012

Pre-FEED for new 50 MBOPD Early Production Facility (LTTF).

Performing Pre- Front End Engineering and Design for a new 50MBOPD Production Facilities for KOC to prepare the tender documents, deliverables including simulations, sizing of equipment, PDFD, PSD and MSD.

Client- KOC-SPETCO

Year- 2012

Preparation of Loop Drawings for TV, Gas Compression and Gas Reinjection Project

Preparation of Instrument Loop drawings

Client- KOC-SPETCO

Year- 2012

Debottlenecking of Gas Sweetening Facility

Feasibility studies on increasing Production capacity from 40 MMSCFD to 60 MMSCFD.

Client- KOC-SPETCO

Year- 2012

Engineering Services Support

Survey and As- built Services for ADOC Offshore Facilities, Mubaraz Island

Client- ADOC- ALSA, UAE

Year- 2012

Detailed Engineering for Replacement of Acid Gas KOD and associated systems

Engineering for Replacement of Acid Gas KOD and Associated piping, instrumentation & controls, civil/structural Systems

Client- GASCO- Trans ME, Abu Dhabi

Year- 2012

Design and Detailed Engineering for Surge Tank, Terminal Loading Facility.

Design of Surge Tanks and Detailed Drawing generation and related structural, instrumentation works.

Client- Qatar Petroleum

Year- 2012

Design and Engineering Services for Structures

Structural and Civil Design

Client- Ras Gas, Qatar

Year- 2012

Preparation of Commissioning Documents

Preparation of Commissioning documents for modification of Offshore platforms

Client- Ramboll O&G, Qatar

Year- 2012

Shifting & Upgrading Pumping Station, PWA, Qatar

Review of Process and Control System Documents

Client- Public Works Authority

Year- 2011

Sucker Rod Pumping System

Pre-Bid Engineering Services

Client- KOC

Year- 2011

Cold Heavy Oil Production with sand (CHOPS)

Pre-bid engineering for the production facility of CHOPS.

Client- KOC

Year- 2011

Gas Compression and Gas Re-injection Project, GCP-GRIP

Project Management and Consultancy Services

Client- KOC-SPETCO

Year- 2010

120 MBOPD Early Production Facility for Ratqa and Abdali-NK

Zero Flaring Study, Preparation of Operational, Safety, Quality and other procedures.

Client- KOC- AL RASHID

Year- 2010

Skid mounted 3-phase Separator.

Process and Mechanical Design

Client- ONGC

Year- 2010

Wet Utilities Distribution Network for Support services, Ras Laffan Industrial City

Front End Engineering and Design (FEED) & Detailed Engineering

Client- Qatar Petroleum

Year- 2008

Detailed Engineering for Blow down study project

Hydraulic study and line sizing, piping GA drawings, isometric drawings, stress analysis

Client- JINAN LLC, Abu Dhabi

Year- 2007

Expertise

Civil And Structural

Civil & Structural department the most latest division of PEC, with its strong quest for standardization finds its slot in the winning mob of Petrocil Engineers & consultants

Electrical

Electrical dept is capable of delivering the following industry standard submittals in line with client expectations.

Instrumentation

Instrumentation division of Petrocil showcases the classic model where world class knowledge acquired through long years of experience blends with young energy,

Mechanical

Mechanical department combines experience & database possessed over the years, along with the thrust of young engineers graduated from top technical institutions.

Pipeline

  • Pipeline Engineering Narrative
  • Scope of work for Topographical Survey
  • Pipeline Material Take-off

Piping

Piping department with the aid of high end softwares like CAESER II has capability in delivering the following in line with the industry expectations

Process

The process division with a thick blend of internationally experienced engineers & with the aid of high end softwares available,

Rotating Equipment

  • Data sheet for Pumps
  • Data sheet for Compressors
  • Data sheet for blowers and other equipment’s

HSE

  • Fire water demand calculation
  • Project safety Plan
  • SCOPE OF WORK FOR HSE STUDIES

Reliability

  • Reliability Study
This is generally done to identify the dominant failure modes in a system and to solve the dominant failure modes.

Corrosion

  • Study for the location of the Corrosion Inhibitor and monitoring System for corrosion and probes.

Design and Drafting

  • Process flow sheets
  • Piping and instrumentation diagrams
  • Piping Layout

Gallery

 

Newsletter

our latest company updates