Pre-FEED Study for Gas Processing Facility GPF

Carry out the Pre-FEED study for a new Gas Processing Facility along with gas export pipeline.
The package items involved in the Pre-FEED study are Inlet Separators, Compressor Package, TEG Unit Package, Gas Metering with analyzers, Pig Launcher / Pig Receiver, Utility Packages- Fuel Gas, Instrument Air, Chemical Injection System, Power Generation, Potable Water, Other Systems- Control System, Open / Closed drain System, Overpressure protection system.
Client- Enerflex, UAE

This entry was posted in news_evnts. Bookmark the permalink.