Crude Column Overhead Condenser (610C) Rating Report

The objective of this project was to report the performance of Crude Column Overhead Condenser 610C

Client- KAR, Kurdistan, Iraq

Year- 2018

Awarded Design review and Detailed Engineering for the KAR-3 Refinery condensate unit
The objective of the project is to study the existing design, identify the design flaws/discrepancies and provide recommendations for improving the design utilizing all the existing equipment’s and hardware efficiently. Additional requirement of new equipment’s also shall be reviewed to meet the design intent of the condensate splitter unit
Client- KAR, Kurdistan, Iraq
Year- 2017
FEED and Detailed Engineering for new Refinery
FEED and Detailed Engineering for a new refinery including Crude unit, Naphtha Stabilizer, Naphtha Splitter, Vacuum unit, Bitumen Oxidation Unit, Reformer unit, Isomerisation unit, Hydrotreater etc.
The scope also includes the detailed engineering for all the utilities involved.
The plant is being designed as SKID MOUNTED MODULAR UNIT.
Client- Confidential, Nigeria
Year- 2017
Up gradation of Feasibility Study Report – Marib Refinery
To upgrade the Cost Estimation as per feasibility study, the study shall develop a detailed Project cost estimate which shall estimate the capital investment, and operation cost associated with installation (Basic and Detailed Engineering, Construction up to handover to the Company) and operation of the new facilities
Client- SEPOC, Yemen
Year- 2017
Detailed Engineering for Hazop Implementation Project
Design and Engineering for turn key implementation of Hazop study recommendations and plant modifications at Abu Dhabi refinery
Client- Takreer-Gulf Coast, Abu Dhabi, Um al Nar
Year- 2012
Implementation   of   Operational   Improvements   to   process   units   at   Abu   Dhabi
Refinery (Umm Al Nar) for TAKREER (EPC)

  • A. Carry out Process Adequacy Check of CRUDE and REFORMER Units, including:
  • 1. Stripper Column
  • 2. Naphtha Splitter column
  • 3. Reformate stabilizer column
  • 4. De-Ethaniser column etc.
  • B. Carry out Hydraulic calculation for:
  • 1. Absorber feed Pump
  • 2. LPG Feed Pump
  • 3. Stabilizer Distillate Pump and
  • 4. Stripper feed pump.
  • C. Check the adequacy of:
  • 1. Reboilers
  • 2. Overhead Condensers
  • 3. PSV’s
  • 4. Control valves etc.
  • D. Preparation of Process Data sheets and other Detailed Engineering documents.

Client -TAKREER Refinery- Litwin- Jinan, UAE
Year- 2008



Civil And Structural

Civil & Structural department the most latest division of PEC, with its strong quest for standardization finds its slot in the winning mob of Petrocil Engineers & consultants


Electrical dept is capable of delivering the following industry standard submittals in line with client expectations.


Instrumentation division of Petrocil showcases the classic model where world class knowledge acquired through long years of experience blends with young energy,


Mechanical department combines experience & database possessed over the years, along with the thrust of young engineers graduated from top technical institutions.


  • Pipeline Engineering Narrative
  • Scope of work for Topographical Survey
  • Pipeline Material Take-off


Piping department with the aid of high end softwares like CAESER II has capability in delivering the following in line with the industry expectations


The process division with a thick blend of internationally experienced engineers & with the aid of high end softwares available,

Rotating Equipment

  • Data sheet for Pumps
  • Data sheet for Compressors
  • Data sheet for blowers and other equipment’s


  • Fire water demand calculation
  • Project safety Plan


  • Reliability Study
This is generally done to identify the dominant failure modes in a system and to solve the dominant failure modes.


  • Study for the location of the Corrosion Inhibitor and monitoring System for corrosion and probes.

Design and Drafting

  • Process flow sheets
  • Piping and instrumentation diagrams
  • Piping Layout




our latest company updates